2 week course ♦
4 week course ♦
12 week course
2 week curriculum
Cooling Units
- Cooling Units
- (a) Cooling Unit Safety
- (b) Removal and Installation
- (c) Diagnosis
- (d) Testing
- (e) Operating Cycle
- (f) Chemical Properties
- (g) How it works
- (h) Perk Tubes
-   (aa) Different Styles
-   (bb) Replacement
-   (cc) Unblocking
- (i) Sandblasting
- (j) De-foaming
- (k) Re-foaming
- (l) Jig and Mold Manufacturing
- (m) Depressurizing
- (n) Flushing
- (o) Pipe Replacement
- (p) Pipe Encasing
- (q) Pipe Bending
- (r) Complete Head Evaporator Replacement
- (s) Levelling
- (t) Pressurizing
- (u) Leak Detection
- (v) Recharging and Safety Procedures
- (w) Bench Testing
- (x) Painting
- (y) Packing
- (z) Shipping
|